Enter the length and width or the area, the depth, the density of your material and an allowance for settling, and this page gives the cubic yards to order and the weight in short tons and pounds. The default 20 x 12 ft area at 4 in deep is 2.96 cu yd, 3.26 cu yd with a 10 percent allowance, and 4.40 short tons (8,800 lb) at 1.35 short tons per cubic yard. For the slab on top use the concrete calculator; for the steel in it, the rebar calculator.
- Length and width in feet, or the total square feet, and the depth the gravel will lie at, in inches or feet. The depth comes from the drawings or the job; this page does not pick one.
- The weight of the material per cubic yard or per cubic foot, as your supplier quotes it. The page names only clean crushed stone of about 3/4 in, near 1.35 short tons per cubic yard, where two sources agree.
- A percentage added to the volume for settling and compaction. It is your own figure: the page found no standard one.
- The result gives the cubic yards to order, the weight in short tons and pounds, the metric tons, and the figures rounded up to the next tenth.
Example result for the default inputs
20 x 12 ft, 4 in deep, 1.35 short tons per cu yd, 10 percent allowance.
Gravel to order
3.26 cu yd
Weight
4.40 short tons
Weight in pounds
8,800 lb
Volume before the allowance
2.96 cu yd
| Area and depth | 20 ft x 12 ft = 240.0 sq ft, 4 in deep |
|---|---|
| Volume in cubic feet | 240.0 sq ft x 4.00 in / 12 = 80.0 cu ft |
| Volume in cubic yards | 80.0 / 27 = 2.96 cu yd |
| With the allowance | 2.96 x (1 + 10 / 100) = 3.26 cu yd; your allowance, this page has no usual figure for it |
| Density used | 1.35 short tons per cu yd (100.0 lb per cu ft), your value |
| Weight in short tons | 3.26 cu yd x 1.350 = 4.40 short tons (before the allowance 4.00) |
| Weight in pounds | 4.40 x 2,000 = 8,800 lb |
| Metric | 3.992 metric tons (3,992 kg). A short ton is 2,000 lb; a metric ton is 1,000 kg, about 2,204.6 lb |
| Rounded up for the order | 3.3 cu yd or 4.4 short tons, to the next 0.1 |
| Cubic yards per ton | 1 / 1.350 = 0.741 cu yd per short ton at this density |
- The density is your input. It changes with the stone, the size, the moisture and whether it is loose in the truck or compacted in place, and the same stone can differ by several percent between suppliers. Use the figure on your supplier's ticket or chart.
- This page finds the quantity of aggregate for one rectangle at one depth. It does not design a base or a road section: the depth, the layers, the grade of the stone and the compaction come from the drawings or the owner.
For estimation purposes only. Consult a licensed engineer for final designs.
Sign up with your email. Back on this page in the same browser, your inputs are filled in. No card.
Free without signup
How the yards and the tons are found
The page multiplies the area by the depth for a volume, converts it to cubic yards, adds the allowance you type, and multiplies by the density you type to get short tons and pounds. The density is your input: it depends on the stone and on the supplier, and this page names only one material, clean crushed stone of about 3/4 in, for which two open sources agree.
- Volume in cubic feet
cu ft = length x width x depth (in) / 12A 20 x 12 ft area is 240 sq ft; at 4 in deep that is 240 x 4 / 12 = 80.0 cu ft. If the area is typed as a total, the same 240 sq ft gives the same 80.0 cu ft. A depth typed in feet is multiplied by 12 first.- Cubic yards
cu yd = cu ft / 27A cubic yard is 3 ft x 3 ft x 3 ft = 27 cu ft. 80.0 / 27 = 2.96 cu yd. At 2 in the same area is 1.48 cu yd and at 6 in 4.44 cu yd.- Allowance
order volume = cu yd x (1 + allowance / 100)With a 10 percent allowance 2.96 cu yd becomes 3.26 cu yd. The allowance is yours, for settling and compaction; this page found no standard figure for it, and 10 is only the example's value.- Weight in short tons
tons = order volume (cu yd) x density (short tons per cu yd)3.26 cu yd x 1.35 = 4.40 short tons, or 8,800 lb. Before the allowance the area is 4.00 short tons. A short ton is 2,000 lb, the unit US suppliers sell by.- Density in pounds per cubic foot
tons per cu yd = lb per cu ft x 27 / 2,000A supplier that quotes 100 lb per cu ft is quoting 1.35 short tons per cu yd, and 99.8 lb per cu ft is 1.347. The page converts the unit you choose, so 8,800 lb comes out the same either way.- Metric tons
kg = lb x 0.45359237, metric tons = kg / 1,0008,800 lb is 3,992 kg, 3.992 metric tons. A metric ton (1,000 kg, about 2,204.6 lb) is about 10 percent heavier than a short ton (2,000 lb): do not read one as the other.
Six areas at 1.35 short tons per cubic yard
Each row uses a density of 1.35 short tons per cubic yard, the figure two sources agree on for clean crushed stone of about 3/4 in, and a 10 percent allowance, worked with the same function as the form. A 10 x 10 ft area 2 in deep takes 0.68 cu yd and 0.92 short tons, and a 30 x 20 ft area 6 in deep takes 12.22 cu yd and 16.50 short tons.
| Area | Depth | Sq ft | Cu yd | Cu yd + 10% | Short tons | Pounds |
|---|---|---|---|---|---|---|
| 10 x 10 ft | 2 in deep | 100 | 0.62 | 0.68 | 0.92 | 1,833 |
| 10 x 10 ft | 4 in deep | 100 | 1.23 | 1.36 | 1.83 | 3,667 |
| 20 x 12 ft | 4 in deep | 240 | 2.96 | 3.26 | 4.40 | 8,800 |
| 20 x 12 ft | 6 in deep | 240 | 4.44 | 4.89 | 6.60 | 13,200 |
| 50 x 10 ft | 4 in deep | 500 | 6.17 | 6.79 | 9.17 | 18,333 |
| 30 x 20 ft | 6 in deep | 600 | 11.11 | 12.22 | 16.50 | 33,000 |
The density is the number that moves the tons. The same 20 x 12 ft area at 4 in is 4.40 short tons at 1.35, 4.62 at Graniterock's drain rock preset of 105 lb per cubic foot, and 6.60 at its base rock preset of 150. Depth is proportional: doubling it doubles the yards.
Standards and data sources
- Lorusso Corp, Conversion Chart (tons per cubic yard of crushed stone, as loaded in the truck) - Read November 25, 2026. Crushed stone, dry or washed, in 3/8, 1/2, 3/4 and 1 1/2 in sizes: 1.35 tons per cubic yard each. The chart says the figures are a guideline, reflect material as loaded in truck bodies, and that material is sold by the ton. It also lists dense graded base at 1.65 to 1.75 and sands at 1.20 to 1.30, which this page does not use as typical values because no second source agreed.
- Graniterock, Wilson 3/4 in Drain Rock product page, ASTM Properties - Read November 25, 2026. Unit weight 99.8 lb per cu ft, which is 1.347 short tons per cu yd at 27 / 2,000; the 1/2 in drain rock page gives 100.7 lb per cu ft. It agrees with the Lorusso chart for clean crushed stone of about 3/4 in. The page does not name the test method or say whether the weight is loose or compacted, so the agreement of the two sources is a cross check, not proof of one method.
- Graniterock, Construction Materials Calculator (Aggregate Estimator) - Read November 25, 2026. Presets Drain Rock at 105 lb per cu ft (1.42 short tons per cu yd) and Base Rock at 150 lb per cu ft (2.03), with a custom field, and no note on loose or compacted. Shown here to make the point that density depends on the material and on how it is placed: it is why the density on this page is your field.
Limitations of this calculator
- This page finds the quantity of loose gravel or crushed stone for one rectangle at one depth. It is an ordering and quoting aid, not a design. The depth, the layers, the grade of the stone, the compaction and any geotextile come from the drawings, the owner or the local requirements, and this page does not check them.
- The density is your input. It depends on the stone, its size and grading, its moisture, and whether it is loose in the truck or compacted in place, and one supplier alone lists clean stone at 100 and 105 lb per cu ft. The page found two open sources that agree for one material only, clean crushed stone of about 3/4 in, near 1.35 short tons per cu yd (100 lb per cu ft), and both are suppliers' figures, not a test report for your load. It gives no figure for pea gravel, crusher run, dense graded base, screenings or sand.
- Density figures differ with the basis. A chart of material as loaded in a truck, a unit weight measured on a sample and a compacted in-place figure for a base are three different numbers for the same stone. Use the figure your supplier bills against, and read the tickets of the first load.
- The allowance is your input, for settling and compaction. The page found no standard or table that gives a usual figure, so it gives no range; the 10 percent of the example is the page's own pick. Material that is spread and rolled takes up less than the loose volume, and the right allowance depends on the material and the work.
- Short tons (2,000 lb) are the headline, the unit US suppliers sell by. The metric ton (1,000 kg) is shown in a row, converted with 1 lb = 0.45359237 kg. The page does not convert between a loose volume and a compacted volume.
- Moisture is not corrected. Wet aggregate weighs more per cubic yard than dry, and a load can be ordered by the ton or by the yard; the page works both, but it does not know which your supplier uses. Truck sizes and load limits are not included.
- One rectangle at one depth. An area of several shapes or depths is worked as separate runs and added by hand, or typed as a total area when it is at one depth. A sloped surface, a crown or a trench is not modeled: use an average depth.
- Values outside the field ranges are not accepted: sides 0.5 to 5,000 ft, area 1 to 10,000,000 sq ft, depth 0.5 in to 4 ft, density 0.5 to 2.5 short tons per cu yd, allowance 0 to 50 percent. A depth in the wrong unit or a density in the wrong unit is refused with a sentence that shows the conversion. These bounds are this page's own.
Common mistakes when ordering gravel
- Typing the depth in the wrong unit. Depth is quoted in inches, and the page has a unit for it. The 20 x 12 ft area at 4 in is 4.40 short tons. The same 4 typed with feet chosen is 48 in and 52.80 short tons, twelve times as much. A depth of 4 ft is the limit this page accepts, and anything deeper is refused.
- Skipping the division by 27. Cubic feet are not cubic yards. The 20 x 12 ft area at 4 in is 80.0 cu ft, which is 2.96 cu yd. Reading the cubic feet as yards, with the 10 percent allowance, gives 88.0 yards, about 27 times too many.
- Ordering yards when the supplier sells tons. A supplier that bills by the ton needs the weight. 3.26 cu yd at 1.35 short tons per cu yd is 4.40 short tons, 35 percent more than the figure in yards. Lorusso's chart says its material is sold and billed by the ton. Ask which unit the order is in before you quote.
- Using one density for every material. Graniterock's own estimator presets drain rock at 105 lb per cu ft and base rock at 150. On the 20 x 12 ft area at 4 in with 10 percent that is 4.62 short tons for the drain rock preset and 6.60 for the base rock preset, against 4.40 at 1.35. Take the density of the material you are buying.
- Reading short tons as metric tons. 4.40 short tons is 8,800 lb, 3.992 metric tons. A supplier abroad or a spec in metric means 1,000 kg per metric ton, about 2,204.6 lb. Ordering 4.40 metric tons against a short ton figure would be 900 lb too much.
- Leaving out the allowance. With no allowance the 20 x 12 ft area at 4 in is 4.00 short tons, 4.40 with 10 percent. Gravel that is spread and compacted ends up thinner than it was loose, and a short order means a second delivery. The percentage is yours; keep it as a visible line in the quote.
Common questions about gravel
How many cubic yards of gravel do I need for 20 x 12 ft at 4 in deep?
The area is 240 sq ft. At 4 in deep that is 240 x 4 / 12 = 80.0 cu ft, and 80.0 / 27 = 2.96 cu yd. With a 10 percent allowance for settling the order is 3.26 cu yd. At 2 in the same area is 1.48 cu yd, and at 6 in 4.44 cu yd, before any allowance.
How many tons are in a cubic yard of gravel?
It depends on the stone and on how it is measured, which is why the page asks for the density. For clean crushed stone of about 3/4 in two open sources agree: Lorusso Corp lists 1.35 tons per cubic yard as loaded in the truck, and Graniterock lists 99.8 lb per cu ft for its 3/4 in drain rock, 1.35 tons per cu yd. Graniterock's own estimator presets 105 lb per cu ft for drain rock (1.42) and 150 for base rock (2.03). For other materials ask your supplier.
How do I convert cubic yards of gravel to tons?
Multiply the cubic yards by the density in short tons per cubic yard. At 1.35, 3.26 cu yd is 4.40 short tons, 8,800 lb. If your supplier quotes pounds per cubic foot, multiply by 27 and divide by 2,000 first: 100 lb per cu ft is 100 x 27 / 2,000 = 1.35 short tons per cu yd.
How do I find cubic yards from square feet and depth?
Multiply the square feet by the depth in inches and divide by 12 for cubic feet, then divide by 27 for cubic yards. A total area of 240 sq ft at 4 in is 80.0 cu ft and 2.96 cu yd. The same area at 6 in is 4.44 cu yd and at 2 in 1.48 cu yd, since volume is proportional to depth.
Should I add extra for compaction or settling?
Gravel that is spread and compacted takes up less room than it did loose, so orders usually carry an allowance. This page found no standard or table that gives a usual figure, so the allowance is your own, from your jobs or your supplier. The default of 10 percent is the page's pick for the example: it moves the 20 x 12 ft area at 4 in from 4.00 to 4.40 short tons.
What is the difference between a short ton and a metric ton?
A short ton is 2,000 lb, the unit US suppliers sell by. A metric ton is 1,000 kg, about 2,204.6 lb, roughly 10 percent more. 4.40 short tons is 8,800 lb or 3.992 metric tons. The page shows both, with the short ton as the headline.
What density should I use for pea gravel, crusher run or sand?
This page does not give one. It found two open sources that agree only for clean crushed stone of about 3/4 in, near 1.35 short tons per cubic yard. For pea gravel, crusher run, dense graded base, screenings and sand the figures it read were single-source or disagreed by basis, loose in the truck against compacted in place. Use the figure on your supplier's chart or ticket, and type it in the density field.
Does this calculator design a gravel base or driveway?
No. It finds the volume and weight of material for an area and depth you give it. The depth, the layers, the stone grade, the compaction and drainage come from the drawings, the owner or the local requirements. The page is for ordering and quoting.