Preliminary sizing by NEC 2023 and NEC 2020 rules. Local amendments and the authority having jurisdiction (AHJ) decide which edition and which rules apply. It does not replace the calculation of a licensed electrician, and it does not work the voltage drop.

Maintained by BuildSolver · Updated

Calculator · Electrical

Subpanel size calculator

A subpanel in a garage, an addition or a separate building is sized from its load. Add the noncontinuous load to 125 percent of the continuous load, take the smallest standard breaker at or above it, pick the wire so the breaker protects it, and take the ground wire from the breaker rating. A feeder of 100 A continuous plus 100 A noncontinuous is 225 A and takes 4/0 AWG copper. A 70 A load on a 100 A breaker takes 3 AWG copper and a 8 AWG ground wire. For a separate building the feeder has four wires and the building needs its own grounding electrode (250.32). The page works 120/240 V single phase up to 400 A. For the length of the run, use the voltage drop calculator. For a branch circuit, use the wire size calculator.

  1. Pick amps or VA. Put the part of the load that runs three hours or more under continuous and the rest under noncontinuous. VA is divided by 240 V.
  2. Copper or aluminum, conduit or NM-B cable, and the 75°C (167°F) or 60°C (140°F) rating marked on the breaker and the subpanel lugs. Say whether the subpanel is in a separate building.
  3. The result gives the feeder breaker, the two hot conductors, the neutral and the ground wire, each with the NEC section behind it. Enter a planned breaker or a neutral load if you have one.

120/240 V single phase, loads to 400 A, copper or aluminum through 4/0 AWG, at 86°F with no more than three current-carrying conductors. No voltage drop, no 310.12, no whole-house load.

VA is divided by 240 V, the voltage across the two hot conductors, to get amps.

Load that runs three hours or more (the NEC Article 100 definition), such as an EV charger or a heater. It counts at 125 percent. Enter 0 if there is none.

The rest of the load on the subpanel, at 100 percent. Add up what will run together, not every nameplate in the building. Enter 0 if there is none. The two together must be above zero.

NM-B (Romex) has 90°C (194°F) conductors but is limited to the 60°C (140°F) column (334.80). NM-B is not permitted in wet or damp locations, outdoors or underground (334.12(B)(4), 300.5(B)), so a feeder to another building runs in conduit or in direct-burial cable.

For a circuit of 100 A or less, terminals count as 60°C (140°F) unless marked 75°C (167°F) (110.14(C)). Read the markings on the breaker and on the lugs.

Only the grounding notes change. The four-wire feeder is the same.

Leave blank for the smallest standard breaker at or above the load. A larger breaker can force a larger wire (240.4). The breaker is a standard rating such as 60, 70, 80, 90, 100 or 125 A.

In amps, the 120 V load on the heavier leg. Leave blank to make the neutral the size of the hot conductors. It cannot be more than the load.

Example result for the default inputs

70 A noncontinuous and 0 A continuous, copper, THHN/THWN conductors in conduit, 75°C (167°F) column, separate building. NEC 215.2, 215.3, Table 310.16, 250.122.

Feeder breaker

100 A

Two hot conductors

3 AWG copper

Neutral

3 AWG copper

Ground wire

8 AWG copper

Calculation details
Load70 A + 1.25 x 0 A = 70 A. The feeder conductors and the breaker are each no less than the noncontinuous load plus 125 percent of the continuous load (215.2(A)(1) and 215.3).
Feeder breaker100 A, the breaker entered. It is not less than 70 A (215.3). It is larger than the load calls for, and it is what sets the conductor size.
Ungrounded conductors, two 3 AWG copper3 AWG is 100 A in the 75°C (167°F) column of Table 310.16, at least 70 A. The next size down, 4 AWG, fails: a 100 A breaker is above the next standard rating (90 A) over its 85 A ampacity (NEC 240.4(B)). The breaker may be rated up to 100 A, and up to the next standard rating only where that ampacity falls between two standard ratings (240.4(B)). Small sizes also have a 240.4(D) limit.
Neutral, 3 AWG copperNo neutral load entered, so the neutral is the size of the ungrounded conductors. Where the 120 V loads are lighter, a smaller neutral is allowed down to the load it carries (220.61), never under the ground wire size below (215.2(A)(2)).
Equipment grounding conductor, 8 AWG copperTable 250.122, 100 A row: 8 AWG copper. If the feeder wire is made larger for voltage drop, the ground wire grows in proportion (250.122(B)); use the equipment grounding conductor calculator.
Separate buildingSeparate building (250.32): run four wires, two hots, the neutral and a ground wire, so the equipment grounding conductor travels with the feeder. At the subpanel the neutral is kept off the ground bar and the enclosure: no main bonding jumper or green screw, and the neutral bar floats. The building needs its own grounding electrode (a ground rod or other electrode) tied to the ground bar, except where a single branch circuit with a ground wire feeds it. The wire to the electrode is sized by 250.66 (see the grounding electrode conductor calculator).
Voltage dropNot worked here. A long run to a garage or a barn is where the wire is made larger than the table; the voltage drop calculator gives the percent for the length.
  • For a circuit of 100 A or less, terminals count as 60°C (140°F) unless the breaker and the subpanel lugs are marked 75°C (167°F) (110.14(C)). Read the markings before using the 75°C (167°F) column.
  • A separate building needs a disconnecting means for the feeder (225.31), at a readily accessible place outside or inside nearest the point where the conductors enter (225.32); a main breaker in the subpanel is the usual way. It also needs a grounding electrode (250.32(A)) unless a single branch circuit with a ground wire feeds it, and the trench has the minimum cover of Table 300.5. These are NEC requirements, not options; the authority having jurisdiction enforces the edition and the local amendments it adopted.

For estimation purposes only. Consult a licensed engineer for final designs.

Get this result as a PDF, free account

Sign up with your email. Back on this page in the same browser, your inputs are filled in. No card.

How the breaker, the wires and the ground are found

A subpanel feeder is sized like any feeder: the load sets the minimum amps, the minimum amps set the breaker, and the breaker and the amps together set the wire. The neutral follows its own load, and the ground wire follows the breaker. For the part that runs a short time the load counts at 100 percent, and for the part that runs three hours or more it counts at 125 percent. Wire comes from the 75°C (167°F) column of Table 310.16, or from the 60°C (140°F) column where the cable or the terminals call for it.

Load in amps
A = VA / 2407,200 VA at 240 V is 30 A. Enter amps directly if you have them.
Required amps
noncontinuous + 1.25 x continuousThe EC&M feeder example, 100 A continuous plus 100 A noncontinuous: 100 + 1.25 x 100 = 225 A (215.2(A)(1)).
Feeder breaker
smallest standard rating at or above the required amps225 A is a standard rating, so the breaker is 225 A. 60 A for the 48 A charger is 60 A (215.3, Table 240.6(A)).
Ungrounded conductors
smallest size with Table 310.16 ampacity at least the required amps225 A takes 4/0 AWG copper, 230 A in the 75°C (167°F) column. 60 A takes 6 AWG.
Breaker and wire together
breaker no higher than the wire's ampacity, or the next standard rating up where 240.4(B) allows it70 A alone takes 4 AWG copper. On a 100 A breaker the wire is 3 AWG, the size the OpenExamPrep example uses (240.4(B), 240.4(D)).
Neutral
its own load, not under the ground wire sizeWith 20 A on the neutral of a 100 A feeder, the load alone takes 14 AWG. The Table 250.122 ground wire is 8 AWG, so the neutral is 8 AWG (220.61, 215.2(A)(2)).
Equipment grounding conductor
Table 250.122 row for the feeder breaker100 A takes 8 AWG copper or 6 AWG aluminum, and 225 A takes 4 AWG copper (250.122, 250.32(B)(1)).

Eight subpanel feeders through the same function

The first two rows are published examples: the 70 A subpanel on a 100 A breaker from OpenExamPrep, and the feeder of 100 A continuous plus 100 A noncontinuous from EC&M. The rest show what moves the answer: a charger counted at 125 percent, a load given in VA, NM-B cable held to the 60°C (140°F) column, aluminum, and a neutral that carries little. All are copper in conduit on 75°C (167°F) terminals unless the row says otherwise.

Breaker, hot conductors, neutral and ground wire for eight subpanel feeders
FeederKnownRequired, ABreaker, AHot wiresNeutralGround
Garage subpanel, 70 A on a 100 A breaker (the default)70 A noncontinuous, 100 A breaker701003 AWG Cu3 AWG Cu8 AWG Cu
Feeder of 100 A continuous plus 100 A noncontinuous100 A continuous, 100 A noncontinuous2252254/0 AWG Cu4/0 AWG Cu4 AWG Cu
60 A subpanel60 A noncontinuous60606 AWG Cu6 AWG Cu10 AWG Cu
48 A EV charger on the subpanel48 A continuous60606 AWG Cu6 AWG Cu10 AWG Cu
Workshop, 7,200 VA7,200 VA noncontinuous303010 AWG Cu10 AWG Cu10 AWG Cu
50 A feeder in NM-B cable50 A noncontinuous, NM-B50506 AWG Cu6 AWG Cu10 AWG Cu
100 A feeder in aluminum100 A noncontinuous, aluminum1001001 AWG Al1 AWG Al6 AWG Al
100 A feeder with a light neutral load100 A noncontinuous, 20 A on the neutral1001003 AWG Cu8 AWG Cu8 AWG Cu

A load of 240 A, the second OpenExamPrep example, needs 250 kcmil copper, which is above the 4/0 AWG this page works. The ground wire follows the breaker rating, so it changes only at the Table 250.122 steps.

Standards and data sources

Limitations of this calculator

  • This is preliminary sizing for a feeder, written to the 2023 NEC with the sources listed above, which cover several editions. Local amendments and the local authority having jurisdiction (AHJ) decide which edition and which rules apply. It does not replace the calculation of a licensed electrician, who designs and installs the feeder under the permit and the inspection.
  • The load is your entry. The page does not add up lights, receptacles and appliances, and it does not do the dwelling demand calculation of Article 220. For the whole house use the home electrical service load calculator, and decide which loads run three hours or more yourself.
  • The simplified dwelling rule of 310.12 is not applied. No open worked example of it was read, so conductors are sized from Table 310.16 directly. Where 310.12 applies it can allow a smaller conductor than the one shown.
  • Temperature correction and the adjustment for more than three current-carrying conductors are not applied. The sizes assume 86°F (30°C) or lower and no more than three current-carrying conductors in the conduit or cable. A hot attic, a long run in the sun or extra circuits in the same conduit need the wire size calculator.
  • Voltage drop is not worked. A long run to a detached garage or a barn is often made larger than the table, and the ground wire has to grow with it (250.122(B)). Check the run with the voltage drop calculator, then the ground wire with the equipment grounding conductor calculator.
  • It covers 120/240 V single phase only, loads up to 400 A, and conductor sizes through 4/0 AWG. VA is divided by 240 V. Three phase, 208Y/120 V, kcmil sizes, parallel conductors and feeders to more than one panel are outside it.
  • The neutral is sized from the single number you give for its largest load, scaled by the same continuous share as the feeder. Nonlinear loads, where the neutral counts as a current-carrying conductor, and harmonic currents are not modeled. Leave the neutral load blank to make it the size of the hot conductors.
  • The 250.32 notes are an outline for a separate building, not a grounding design. The electrode and the wire to it (250.66), the disconnect the NEC requires at the building (225.31, 225.32), the trench cover depth of Table 300.5, GFCI and AFCI protection and the rules for a second feeder are not worked here.
  • A 75°C (167°F) column holds only where the breaker and the subpanel lugs are marked for it. Aluminum needs lugs marked for aluminum. Equipment listed for continuous operation at 100 percent of its rating, which lets the continuous load count at 100 percent, is not modeled.
  • Loads above 400 A, motors on the feeder, and feeders that supply a generator, a solar system or a battery are outside this page.

Common mistakes sizing a subpanel feeder

  1. Sizing the feeder from the subpanel's bus rating. A 100 A subpanel does not need a 100 A feeder. The load decides. A 70 A load needs a 70 A breaker and 4 AWG copper. Put the same load on a 100 A breaker and the wire goes to 3 AWG, and the ground wire is 8 AWG. Size from the load, then choose the breaker, and leave room for growth on purpose.
  2. Counting a continuous load at 100 percent. A 48 A EV charger runs for hours. At 125 percent it is 60 A, so the feeder breaker is 60 A. Counted at 100 percent it is 48 A and a 50 A breaker, a size too small for the charger.
  3. Putting a bigger breaker on the same wire. A 60 A load takes 6 AWG copper on a 60 A breaker. A 100 A breaker on that feeder needs 3 AWG, because 240.4(B) lets a breaker round up to the next standard rating only when the wire's ampacity falls between two standard ratings. Change the breaker and the wire in the same step.
  4. Using the 75°C (167°F) column for NM-B or for 60°C (140°F) terminals. A 50 A feeder takes 8 AWG copper in conduit in the 75°C (167°F) column. In NM-B cable, held to the 60°C (140°F) column, it takes 6 AWG. A 100 A feeder takes 3 AWG on 75°C (167°F) terminals and 1 AWG on 60°C (140°F) terminals. Read what the breaker and the lugs are marked for.
  5. Running three wires to a detached garage. A feeder to a separate building carries two hots, a neutral and a ground wire. The neutral is not connected to the ground at the building: no main bonding jumper in the subpanel, a floating neutral bar and a separate ground bar. The ground wire travels with the feeder, and the building gets its own grounding electrode unless a single branch circuit with a ground wire serves it (250.32).
  6. Leaving the ground wire out of the size check. The ground wire follows the breaker, not the load: 100 A takes 8 AWG copper, and 225 A takes 4 AWG. The neutral is also never smaller than that size. When the feeder wire is made larger for voltage drop, the ground wire is made larger in proportion (250.122(B)).

Common questions about subpanel feeders

What size wire do I need for a 100 amp subpanel?

It depends on the load and the terminals. A 100 A feeder on 75°C (167°F) terminals takes 3 AWG copper (100 A in Table 310.16) or 1 AWG aluminum. On 60°C (140°F) terminals it takes 1 AWG copper. The ground wire is 8 AWG copper or 6 AWG aluminum (Table 250.122).

What size breaker feeds a garage subpanel?

The smallest standard breaker at or above the noncontinuous load plus 125 percent of the continuous load. A 60 A load takes a 60 A breaker and 6 AWG copper. A 48 A EV charger counts as 60 A and takes a 60 A breaker.

Does a detached garage need a four-wire feeder?

Yes. Under 250.32 the feeder to a building carries an equipment grounding conductor along with the two hots and the neutral. At the garage the neutral stays separate from the ground bar and the enclosure, and equipment is grounded through the ground wire.

Does a detached garage need its own ground rod?

A building supplied by a feeder needs a grounding electrode system at the building, tied to the ground bar and sized under 250.66. The exception: no electrode is required where only a single branch circuit, including a multiwire branch circuit, supplies the building and that circuit includes an equipment grounding conductor. Your inspector confirms what is required locally.

Can I use NM-B cable to a subpanel?

NM-B is limited to the 60°C (140°F) column of Table 310.16 (334.80). A 50 A feeder takes 6 AWG copper in NM-B and 8 AWG in conduit. Inside the house or an attached garage NM-B is common. It is not permitted in wet or damp locations (334.12(B)(4)), and the inside of an underground conduit is a wet location (300.5(B)), so the feeder to a detached garage or another building cannot be NM-B: use wet-rated conductors such as THWN-2 in conduit, or direct-burial cable such as UF-B. NM-B cable also has the neutral the same size as the hot conductors.

What size is the neutral on a subpanel feeder?

It carries the unbalanced load, the largest 120 V load on one leg, and it is never smaller than the Table 250.122 ground wire for the breaker (215.2(A)(2)). With no neutral load entered this page makes it the size of the hot conductors. With 20 A on a 100 A feeder the neutral is 8 AWG copper, the ground wire size.

How do I convert VA to amps for a 240 V subpanel?

Divide by 240. 7,200 VA is 30 A, which takes a 30 A breaker and 10 AWG copper. Loads wired between a hot and the neutral are 120 V, so enter the larger leg as the neutral load.

Does this account for voltage drop on a long run?

No. The sizes here are for ampacity and the breaker. A long run to a barn or a shop can lose enough voltage to need a larger wire. Check the length with the voltage drop calculator, and if the wire grows, grow the ground wire in proportion with the equipment grounding conductor calculator.